Case Studies — Abatement Systems

The latest from integratedAIR Systems — project case studies, company news and industry insight.

  • Multi-Zone Hot Duct with Dust and Fume Extraction

    Case Study

    Multi-Zone Hot Duct with Dust and Fume Extraction

    integratedAIR, alongside our strategic partner DURR , was approached by a global leading canmaker for a site in Denmark operating an external regenerative thermal oxidiser (RTO) system. The client required a new RTO externally as the existing unit no longer satisfied the production requirements. Additionally, the existing ducting systems that fed into the old system had to be extended and modified whilst accommodating future capacity. With duct temperatures ranging from 70°C to 250°C across the system careful consideration had to be made to ensure high temperature ducting was properly insulated to avoid internal build-up of condensation within the ducting the challenge lay in designing a tailored system for the new hot ducting and a new fume extraction system with filter as well as relocating the existing filters to the new RTO area and changing all existing change over stacks on the roof during a set shut down period.

    • Ducting
    • Abatement Systems
    • Fume Extraction
    View more: Multi-Zone Hot Duct with Dust and Fume Extraction
  • Hot, Sprays and  Cold Ducting System​

    Case Study

    Hot, Sprays and Cold Ducting System​

    integratedAIR Systems was commissioned to design, manufacture and implement an above-roof hot, sprays and cold ducting system as part of a collaboration with DURR to better serve our end client's requirements for a VOC abatement system.

    • Abatement Systems
    • Process Cooling and Heat Recovery
    View more: Hot, Sprays and Cold Ducting System​