Case Study
Scrap System Upgrade in Tight Shutdown Window
integratedAIR was appointed to design and implement a complete upgrade of an ageing scrap extraction and baler feed system within a high-output can manufacturing facility. The existing system was over 30 years old and no longer capable of supporting the site’s operational demands. The project required the full strip-out of the existing scrap system, installation of new air separators, ductwork, platforms, and controls, and preparation for the integration of two new balers, all within a strictly limited factory shutdown period.
- Ducting
- Scrap and Waste Extraction